Power and Energy

 
In order to realize the government’s vision to provide electricity to most of the population at a reasonable price and to achieve overall socio-economic development of the country, the government of Bangladesh has initiated a Power and Energy Sector Development Roadmap (2010-2021) which targeted to produce 8,500 MW by 2013, 11,500 MW by 2015 and 20,000 MW by 2021. However, to ensure overall and balanced development of this sector government has taken immediate plan (2010), short-term plan (2011), medium-term plan (2012-2015) and a long-term development plan (2016-2021). The plans have been developed based on a techno-economic analysis and a least-cost option. These plans include balanced development in generation, transmission and the distribution system to achieve a desired level of reliability of supply.